Demolition contractor for Santa Clara and Santa Clara County

Request a demolition quote →
Get a Quote
Bulldozer clearing brush on a rural lot (Santa Clara Demolition Pros)

Patrick Henry Drive demolition

Demolition Contractor in Patrick Henry Drive, Santa Clara

The office and R&D campus along Patrick Henry Drive is planned to become a residential neighborhood. Before any of that gets built, two and three story office buildings, big parking lots and their slabs have to come out.

Office and R&D Demolition in the Patrick Henry Drive Plan Area

The Patrick Henry Drive plan area sits west of Great America Parkway, north of Mission College Boulevard, with Calabazas Creek on its western edge. It was built out as a suburban office park: low and mid-rise buildings set back behind lawns, ringed by surface parking. In 2022 the city adopted a specific plan that rezones most of it for high-density housing, with parks and new streets threaded through.

The buildings here are mostly office and R&D construction from the late 20th century. Compared with the tilt-up warehouses elsewhere in north Santa Clara, they have more glass, more interior finishes, raised access floors in some spaces, rooftop mechanical equipment and elevators. Demolishing them is a sequence: interior strip-out, equipment removal, then the structure and the slab.

Red barn on a rural lot (Santa Clara Demolition Pros)

Strip-Out Before Structural Demolition

We start inside. Ceiling grid, carpet, raised floors, cabling, glass partitions and furniture systems come out first and are sorted for recycling, since mixing them into the structural debris makes all of it harder to recycle. Glass curtain walls and windows are removed in a controlled way before the frame comes down.

Rooftop units, chillers and elevator equipment are removed next. Refrigerants are recovered by a certified technician before units are cut or hauled. Some of this equipment has resale value, which can offset part of the demolition cost.

Asbestos Surveys, Permits and SVP Service Removal

Office buildings from before the 1980s may contain asbestos in fireproofing, floor tile, mastic and drywall compound; even newer ones get surveyed. Any asbestos is abated by a certified contractor first, then the BAAQMD notification is filed and the City of Santa Clara issues the demolition permit.

Office campuses here draw a lot of power, and Silicon Valley Power usually owns the transformers on site. Removing that equipment is scheduled with SVP well ahead of demolition. PG&E handles gas. Fire service lines, domestic water and sewer laterals are cut and capped as the city requires.

Interior stripped to the wall studs for a remodel (Santa Clara Demolition Pros)

Parking Lots, Creek Edges and the Hetch Hetchy Corridor

Surface parking takes up much of each parcel, so asphalt removal and recycling is a big part of the work. Asphalt, base rock and concrete are separated so each can go to the right recycler, or be crushed for reuse under the new streets and buildings when the project allows.

The plan area is bordered by Calabazas Creek on one side and the Hetch Hetchy water right-of-way on the north. Work near the creek needs erosion control and may have setbacks. The water corridor carries large pipelines, and heavy equipment crossing or working near it usually needs approval from the agency that owns it. We confirm those limits before we plan haul routes.

  • Asphalt and base rock removal
  • Erosion control along Calabazas Creek
  • Haul routes clear of the water corridor
  • On-site crushing when approved

Demolition Work We Handle on Patrick Henry Drive

01

Office Building Strip-Out and Demolition

Interiors are stripped and sorted, then the structure is taken down, so finishes, glass and metal can be recycled separately from concrete.

02

Rooftop Equipment Removal Before Demolition

Chillers, rooftop units and elevator equipment are removed after refrigerant recovery by a certified technician, with resale where it makes sense.

03

Patrick Henry Drive Parking Lot Removal

Large surface lots are removed with asphalt, base and curbs kept separate for recycling or crushed for reuse on the new project.

04

Creek and Right-of-Way Protection on Site

Erosion control near Calabazas Creek and planned haul routes around the Hetch Hetchy corridor keep the work within the limits set by the agencies involved.

Demolition FAQs

Patrick Henry Drive Demolition Questions

What is the Patrick Henry Drive Specific Plan?

It is the city's plan, adopted in 2022, to turn the office and R&D area along Patrick Henry Drive into a residential neighborhood. Demolition of the older buildings is the first physical step on each parcel.

Can office equipment and furniture be salvaged before demolition?

Yes. Furniture systems, mechanical equipment and some fixtures can be removed for resale or reuse before the strip-out, which can offset part of the cost.

Who removes the electrical transformers on site?

Silicon Valley Power owns and removes its own equipment. We schedule that with them early, since it often sets the earliest date structural demolition can begin.

Are there restrictions near the Hetch Hetchy right-of-way?

Usually. Large water pipelines run through that corridor, and heavy equipment crossing or working near it typically needs the owning agency's approval. We plan routes to avoid it where possible.

Excavator pulling down the wall of a house beside a rubble pile (Santa Clara Demolition Pros)

Demolition quote

Request a Patrick Henry Drive Demolition Quote

Tell us which parcel, how many buildings and when the site has to be ready. We follow up within 24 hours.

  • Permits
  • Demolition
  • Haul-off

Request a Demolition Quote

Tell us about the job. We reply within 24 hours.

We will reach out via phone or email within 24 hours.

Get a Demolition Quote