Demolition contractor for Santa Clara and Santa Clara County

Request a demolition quote →
Get a Quote
Office building being demolished with concrete rubble in front (Santa Clara Demolition Pros)

El Camino Real demolition

Demolition Contractor in El Camino Real, Santa Clara

El Camino Real runs the length of Santa Clara, lined with strip centers, motels, auto shops and restaurants built decades ago. As the corridor is rebuilt, we handle the storefront strip-outs and small commercial demolition that come first.

El Camino Real Storefront Strip-Outs

A lot of the work on El Camino Real stops short of a teardown. Strip centers keep standing while tenants turn over, and every turnover means the old build-out has to go. The salon becomes a taqueria, the taqueria becomes a dental office. We pull walls, ceilings, flooring, plumbing fixtures, counters and signs, and hand the landlord a clean shell.

Restaurant strip-outs here are the most involved. Hoods and ductwork, walk-in coolers, grease interceptors and tiled floors with floor drains all come out. We coordinate with the landlord on what stays, like the grease interceptor if the next tenant is also a restaurant, and protect the neighboring suites that are still open.

Collapsing barn overgrown with trees (Santa Clara Demolition Pros)

Small Commercial Building Demolition on El Camino Real

Santa Clara has a plan for El Camino Real that encourages housing and mixed use buildings in place of single story commercial. That brings a steady stream of small demolition jobs: older motels, freestanding restaurants, auto repair shops and used car lots, and one story retail strips.

Each of these has its own quirks. A motel is really dozens of small rooms, each with its own bathroom, wall heater and layers of old finishes that the asbestos survey has to sample. Auto shops have in-ground lifts, oil separators and sometimes waste oil tanks that need to be closed out properly. Car lots are mostly asphalt and light poles. We plan the survey, abatement, closures and permit for each one as a separate scope.

  • Motels and small hotels
  • Freestanding restaurants
  • Auto repair shops and car lots
  • Single story retail strips

El Camino Real Demolition Traffic, Caltrans Permits and Neighbors

El Camino Real is a state highway, so any work in the street, on the sidewalk or at a driveway approach usually needs a Caltrans encroachment permit in addition to the City of Santa Clara permits. Lane closures, sidewalk detours and truck turning movements all have to be planned and approved.

Most parcels on the corridor back up to single family homes on the side streets. We fence and screen those edges, keep dust down, and schedule truck traffic to avoid the busiest commute hours. Bus stops in front of a site are kept open or relocated only as the permits allow.

Pavement crew with a skid steer and roller (Santa Clara Demolition Pros)

El Camino Real Demolition Permits, SVP and Recycling

The City of Santa Clara Building Division issues demolition and tenant improvement permits along El Camino Real. Asbestos surveys come before any demolition or strip-out that disturbs building materials, and a certified abatement contractor handles any positive materials while our crew waits. Whole buildings also need a BAAQMD notice filed before they come down.

Electric disconnects go through Silicon Valley Power, and gas through PG&E. Concrete, asphalt, metal and clean wood are separated for recycling. Commercial sites on the corridor are small, so we often load straight to trucks rather than stockpiling.

Demolition Work We Handle on El Camino Real

01

Retail and Restaurant Strip-Outs

Suites are stripped back to shell, including hoods, walk-ins, fixtures and finishes, while neighboring tenants stay open and protected.

02

Motel and Small Commercial Demolition

Motels, restaurants and one story retail buildings are taken down to the slab or to dirt after surveys, abatement and utility shutoffs.

03

Auto Shop and Car Lot Removal

In-ground lifts, separators and paved lots are removed, with tanks closed under the right agency and asphalt recycled.

04

El Camino Real Traffic and Permit Coordination

We plan lane closures, sidewalk detours and truck routes and work under both city and Caltrans permits on this busy corridor.

Demolition FAQs

El Camino Real Demolition Questions

Do I need a Caltrans permit for demolition on El Camino Real?

If the work touches the street, sidewalk or driveway approach, usually yes, since El Camino Real is a state highway. Work entirely on private property is permitted by the City of Santa Clara.

Will the rest of the strip center stay open during a restaurant strip-out?

Yes. We protect shared walls and common areas, schedule noisy work with the landlord and keep the parking lot clear for customers.

What about the waste oil tank at an old auto shop?

Tanks have to be closed under the oversight of the agency that permits them, usually with an environmental consultant. We coordinate that closure before demolition.

How long does it take to demolish a small motel?

The demolition itself may take one to two weeks. The survey, abatement and utility disconnects often take longer and set the schedule.

Aerial view of an excavator on a dry lot (Santa Clara Demolition Pros)

Demolition quote

Get an El Camino Real Demolition Quote

Tell us the address, what the building was used for and what is planned next. We will follow up within 24 hours.

  • Permits
  • Demolition
  • Haul-off

Request a Demolition Quote

Tell us about the job. We reply within 24 hours.

We will reach out via phone or email within 24 hours.

Get a Demolition Quote